Loading the plant
Tragency Middle East · Est. 1981

Partners in process optimization since 1981.

A family business bringing the world's leading process technology to oil, gas, petrochemical, fertilizer, water and energy plants across Egypt and the Gulf.

  • 45years in business
  • 3generations
  • 4locations: Egypt and the Gulf
  • 8industries, from aviation to water
Since 1981

Forty-five years, three generations.

  1. 1981ZamalekFounded as Middle East Star

    Middle East Star opens as a commercial agent in Zamalek, Cairo.

  2. 1988HeliopolisMoves to Heliopolis

    The company outgrows Zamalek and moves to Heliopolis.

  3. 1995EgyptStrategic vacuum plant

    First strategic vacuum plant supplied.

  4. 2005DubaiTME founded in the UAE

    Tragency Middle East is set up as a free zone trading company in the UAE.

  5. 2006EgyptFiltration test rig on site

    First regional site services with our own filtration test rig.

  6. 2007KuwaitFirst site service abroad

    Our engineers carry out their first site service in Kuwait.

  7. 2008AviationAviation contract

    Biggest consultation contract in the aviation industry, with a German company.

  8. 2010EgyptFirst job as a packager

    First complete package designed, built and delivered by us.

  9. 2011Kuwait, UAEFirst Gulf orders

    First regional orders in Kuwait and the UAE.

  10. 2013DubaiDAFZA office opens

    Head office opens in Dubai Airport Free Zone.

  11. 2015EgyptBiggest reformer order

    Biggest order yet for reformer tubes and services.

  12. 2016EgyptFull commissioning by TME

    Supply, assembly, pre-commissioning, commissioning and start-up, all by TME.

  13. 2017Ain SokhnaSonker BOG package

    Boil-off gas and refrigeration package for Sonker with Petrojet: our biggest order as agents, EUR 24 million.

  14. 2019CairoISO 9001 certified

    Certified to ISO 9001 for quality management.

  15. 2020Marsa Matrouh12,000 m³ a day of water

    Our first seawater desalination plant, 12,000 m³ a day, with a year of operation and maintenance.

  16. 2021SuezPhenol wastewater plant

    Egypt's first phenol wastewater treatment plant, part of the national campaign to protect the Red Sea.

  17. 2022CairoTME Egypt established

    TME Egypt is established.

  18. 2023New CairoCairo Festival City

    Offices move to Cairo Festival City, and we enter Egypt's aviation market.

  19. 2024Cairo, DubaiThree times the business

    Revenue triples on the year before.

  20. 2025DubaiARVOS agency signed

    Agency agreement signed with ARVOS, a leading global manufacturer of heat recovery equipment.

  21. 2026Cairo, DubaiThird generation on board

    Still family owned, now with the third generation in the business. Forty-five years, and you still reach the owners.

A family business since 1981

You reach the owners.

Tragency was founded in 1981 as a family business, and forty-five years later it still is. Three members of the family lead it today, the third generation has joined them, and one partner has become family in every way that matters.

We have chosen to stay a boutique company and to stay hands-on. When you call Tragency you do not reach a call centre or a distant regional office. You reach the owners, who will be on site with you and still be here for your next turnaround, and the one after that.

Big enough to bring you the world's best technology. Small enough that every relationship is personal.

Progress is not achieved alone. It is achieved in partnership: with you, with our technology partners, and with all who share the vision of a greener, safer and more efficient industry.

Reference projects

The work behind the name.

Fifteen jobs from Egypt's leading plants, with the makers we brought to them.

See all fifteen on the map
Filtration and separation

Dust filter

1,400MMSCFD gas

Client
UGDC (BP and EGPC)
Site
Port Said plant
Partner
Pall
Read the story
Filtration and separation

Inlet separator upgrade

1,400MMSCFD, up from 1,200

Client
UGDC (BP and EGPC)
Site
Port Said plant
Partner
FMC Separation Technology
Read the story
Filtration and separation

Liquid-gas coalescer upgrade

1,400MMSCFD, up from 1,200

Client
UGDC (BP and EGPC)
Site
Port Said plant
Partner
Pall
Read the story
Filtration and separation

HP compressor scrubber upgrade

0new vessels: more capacity in the same ones

Client
Pharaonic Petroleum Company
Site
Port Said gas processing plant
Partner
FMC Separation Technology
Read the story
Filtration and separation

Offshore separators

16,000barrels a day

Client
ADES and Petrozenima
Site
Mobile offshore production unit
Partner
Sulzer
Read the story
Water

Oily water treatment

8,000m³ a day

Client
KPC (Apache and EGPC), with Enppi
Site
Kalabsha field, Western Desert
Partner
IDC
Read the story
Reformer tubes

Primary reformer revamp

1,200tonnes a day

Client
Delta Fertilizers
Site
Mansoura plant
Partner
Manoir, BD Energy, MP
Read the story
Reformer tubes

Reformer tube inspection

285tubes inspected

Client
AQFC (licensor KBR)
Site
Ain Sokhna
Partner
MP
Read the story
Process packages

Deaerator

26m³ an hour

Client
ANRPC, with Enppi
Site
Alexandria
Partner
Sterling
Read the story
Water

Two desalination plants

17,000m³ a day

Client
NOPWASD
Site
Marsa Matrouh and El Arish
Partner
UNIHA and Orascom
Read the story
Water

Raw, demi and condensate water

EUR 5Mutility packages

Client
ASORC, with Enppi
Site
Assiut
Partner
IDC
Read the story
Process packages

Two ammonia compressors

EUR 6.5Mcompressor order

Client
APRC, with Enppi
Site
Alexandria
Partner
LMF
Read the story
Process packages

Boil-off gas and refrigeration

EUR 24Mour biggest order as agents

Client
Sonker, with Petrojet
Site
Ain Sokhna
Partner
REI
Read the story
Water

Phenol wastewater treatment

EUR 10MEgypt's first such plant

Client
Nasr Petroleum Company, with Petrojet
Site
Suez
Partner
IDC
Read the story
Aviation

CDFX water barrier

100%market share

Client
Misr Petroleum Company
Site
Cairo
Partner
Parker and Velcon
Read the story
Technology partners

The world's makers, brought to your plant.

  • COES
  • Parker
  • Schmidtsche Schack ARVOS
  • arflu
  • REI
  • Mayekawa
  • Polaris
  • Gardner Denver
  • UNIHA
  • Danfoss
  • Foerster
  • Belleli
  • Greens Combustion
  • SUPCON
  • Rotork
  • Engemasa
  • LMF
  • IDC
  • IGS
  • Tema India
  • Villa Scambiatori
Clients

Trusted by regional clients.

  • Shell
  • Eni Saipem
  • Enppi
  • SIDPEC
  • SUMED
  • Doosan
  • Elsewedy Electric
  • Petrobel
  • Rashpetco
  • Khalda
  • ASORC
  • Abu Qir Fertilizers
  • Degremont Suez
  • Sonker
  • NOPWASD
  • Nasr Petroleum
  • Ezz Steel
  • Suez Steel
  • ADES
  • Dodsal
  • EFC
  • EHC
  • ERC
  • EPROM
  • EPP
  • EMC
  • SEGAS
  • SOPC
  • Sidi Krir
  • QPIC
  • Petromaint
  • P&G
  • TCI
  • SEMADCO
  • APC
  • Al-Majd
  • UGDC
  • AMOC
See how it works

World-class equipment. Our engineers on your site.

We supply, install, inspect and service the equipment that keeps oil, gas, fertilizer and water plants running.

Watch the films
Scroll
Heat transfer

Heat exchangers, sized for your duty.

Shell and tube, plate and spiral units from leading makers, with local engineers behind every one.

Site service

When it fouls, we pull it.

  1. 01Unbolt the channel
  2. 02Lift it clear
  3. 03Draw the tube bundle
  4. 04Clean, inspect, return to service
Inspection

Find the thin wall before it leaks.

An eddy current probe runs every tube end to end, so you replace only what is failing.

Eddy current · tube scanReady
VerticalHorizontalProbe 0.0 m
Four locations

Egypt and the Gulf.

Tragency Middle EastHead office, Dubai Airport Free Zone, P.O. Box 97177, Dubai, UAE
TME EgyptOffice 406, Podium 1, Cairo Festival City, New Cairo
TME Egypt Head OfficeHeliopolis, P.O. Box 431, Cairo, Egypt
TME Storage and Discharge FZC FacilityLogistics hub, Ismailia Free Zone, Ismailia, Egypt
What we supply

Six product lines, one team that installs them.

Heat transfer

Shell and tube and plate exchangers, spiral units, fired heaters, columns, condensers and waste heat boilers.

Tranter · ARVOS · Villa Scambiatori · Tema India · Belleli · IGS

Reformer tubes

Tubes, manifolds and coils for ammonia and hydrogen reformers, steam cracking and steel furnaces.

Engemasa · Manoir · MP Foerster

Fluids measurement and control

Valves and actuators, valve sealant, metering skids, pressure reducing stations, hydraulic oil purification.

Rotork · SUPCON · arflu

Filtration and separation

Coalescers, separator internals, demisters and vane packs, fuel gas conditioning, air intake filters.

Pall · Parker · Sulzer

Water and wastewater plants

Reverse osmosis, sea and brackish water desalination, demineralised water, zero liquid discharge, ultrafiltration.

IDC · UNIHA

Process and utility packages

Instrument air packages and dryers, boil off gas recovery, refrigeration, flares and loading arms.

Polaris · REI · LMF · Mayekawa · Gardner Denver · Sterling
TEMA type explorer

Build your exchanger.

Pick the three letters you specify every day. Switch on x-ray to see what changes inside.

Front head
Shell
Rear head
AES1000 × 6096

Reformer tubes

Twenty degrees too hot halves a tube's life.

Reformer tubes are designed for about 100,000 hours at their design wall temperature. Drag the temperature and watch what overheating costs.

11.4years of expected tube life

Rule of thumb: 20 °C above design halves tube life. Design basis 100,000 hours (API 530).

Filtration and separation

One stream in. Gas, oil and water out.

A well stream arrives as one mix. The internals of a three phase separator slow it, settle it and send each phase to its own outlet.

  1. 1Inlet deviceBreaks the stream's speed and drops the liquid out of the gas
  2. 2Calming baffleA perforated plate that evens the flow so droplets settle
  3. 3Sand jets and pansWash settled sand to the drains without a shutdown
  4. 4WeirOil spills over it, water stays behind
  5. 5Vortex breakersStop the outlets drawing gas into the liquid lines
  6. 6Vane packCatches the last oil mist before the gas leaves
Fluids measurement and control

Turn it by hand. Feel it let go.

Every motor operated valve has a handwheel for when the power is off. The first few degrees take the most force. That is breakaway torque, and it is what we size actuators by.

0% open

Heat transfer

Opened on site. Every plate checked.

Plate heat exchangers foul and their gaskets age. We open the pack where it stands, clean and inspect each plate, regasket where needed and close it to its design length.

Pull the pack apart

0of 40 plates open
Water and wastewater plants

It takes 60 bar to beat the sea.

Reverse osmosis pushes seawater through membranes at around 60 bar. Salt stays behind, fresh water comes through. At Remeilah 3 that is 12,000 cubic metres a day.

0bar at the membranes

Tilt the jug to pour. Seawater pushes back at about 27 bar: below that, nothing comes through.

Process and utility packages

Bring the arm home in one move.

A top loading arm swings out from the gantry, drops into the tanker's hatch and seals its vapour hood, so nobody on the bay lifts a hose. We supply, install and service loading arms and the packages around them.

Drag the arm to the open hatch

Ask about loading arms
Chemical injection packages

Every joint tested before it ships.

A chemical injection package arrives as one skid: tank, strainer, calibration column, two dosing pumps and their header. We pipe it, test every joint and run it before it leaves the shop.

0of 4 joints made

Flares

Three pilots, then the flame.

A flare burns off gas the plant cannot use, safely and high above it. Its pilots burn day and night so the flare is always ready to take a release. We supply flare stacks, tips and their ignition systems.

See it at full size

Put E‑101 in your plant.

Spin the exchanger here, or open it in augmented reality on your phone and walk around it at real scale.

QR code that opens this exchanger on your phone

Scan with your phoneto place it in your plant at real size.

Site services

Our crews, your shutdown.

Tragency Process Conference
TPC 2027

A day with the engineers behind the region's plants and the makers behind the equipment. Register your interest and we will send you the date and programme first.

Past editions: TPC 2025 and TPC 2026

The region's plant engineers with our partners on stage, questions from the floor, and a gala evening to close. Held at the Four Seasons, Alexandria, with SUPCON and Rotork among the partners on stage.

  • The Tragency screen on stage at TPC 2026On stage
  • A question from the floor at TPC 2026Questions from the floor
  • Everyone at TPC 2026 together under the Tragency screenOne room
  • Guests at the TPC 2026 gala evening in front of the Tragency backdropThe gala evening
Talk to an engineer

Tell us what your plant needs.

Equipment, spares, site service or an inspection: an engineer replies with the next step.

Cairo +20 2 2623 3110
Dubai +971 4 260 2195
Email sales-tragency@tragency.com

We would like to grasp this opportunity to extend our gratitude to TME for the distinguished efforts and timely support extended to ensure the smooth execution of this job.

Alexandria Mineral Oil Co. (AMOC)

ISO 9001 certified for quality management since 2019

All client letters